Picked up some free insulation board and had the table saw set-up. An item that will be nessisary for the 5 Ton rebuild an insulation box for the heat exchangers. I fab'ed up some boxes that will slip over after the BPHX are soldered inplace.

Recovered the R290 BBQ gas refrigerant while on the other-side of the shop soldering up some more risers for the shop solar hot water system.