View Single Post
Old 10-28-11, 05:09 PM   #9
Slidegate
Lurking Renovator
 
Slidegate's Avatar
 
Join Date: Oct 2011
Location: Mercer, Pa.
Posts: 19
Thanks: 1
Thanked 4 Times in 3 Posts
Default

OK here are the pics you asked for. The first picture shows the motor and the 2 gear boxes mounted 90 deg apart, the second picture shows the second gear box meshing with an idler gear with a starter gear brazed to it. The third shows the whole gear assy spring loaded to the flywheel. Real easy disconnect there. The fourth is a little fuzzy but it shows a coupler with set screws to connect the 2 together. The fifth shows the whole assy. You need to be able to do a little metal work to do the combo but it sure does work smooth. Hope this helps. Any more ? feel free to ask
Attached Images
     

Last edited by Slidegate; 10-28-11 at 05:18 PM..
Slidegate is offline   Reply With Quote