OK here are the pics you asked for. The first picture shows the motor and the 2 gear boxes mounted 90 deg apart, the second picture shows the second gear box meshing with an idler gear with a starter gear brazed to it. The third shows the whole gear assy spring loaded to the flywheel. Real easy disconnect there. The fourth is a little fuzzy but it shows a coupler with set screws to connect the 2 together. The fifth shows the whole assy. You need to be able to do a little metal work to do the combo but it sure does work smooth. Hope this helps. Any more ? feel free to ask
Last edited by Slidegate; 10-28-11 at 05:18 PM..
|