View Single Post
Old 10-15-11, 10:20 AM   #35
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

I started preparing the spot where the hot water tank is going to go. To do this, I needed to bust out a concrete pad that was in the basement. This will get the tank an additional 12-13" lower and help the drainback system work better.

This is the location of the tank and the pad that is in the way.




I started smashing the poured center of the concrete pad.




Quickly enough the bricks on the outside became loose and I was able to pull them away.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote