Sunday morning we started yet another project on the garage. The 17 foot garage door had some sag at the top.

So, we jacked the door up.




Then, we lag bolted a LBL up to the existing 2x12 frame pieces.




We started putting the siding back on, and also added a motion sensing light next to the new door. This didn't totally eliminate the sag, but it is much better now.




Then, we added a few more receptacles along the wall where the old door used to be.




And, we buttoned up the wiring to the panel, got the garage door opener mounted, put switches in (were just using breakers for a while), and put covers on everything.




All that, plus clean up time brought us to the end of the day. The in laws still had a 4 hour trip to go home, so we didn't get to work too late. But, it was pretty nice to rest for a few hours before going to sleep!

I still have to button a few things up. Receptacles still need to be added to the back (long) wall of the garage. We just didn't get time to do that. There is also caulking to be done to seal a few things up. I have an especially nice picture showing light shining through the sill plate area. After those things, we can look at doing some insulating!
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote