Ground loops under the driveway
The builder's original quote included a new driveway.
"Because I am going to destroy your current one
with my heavy trucks."
So I said, I can do the driveway after refinance?
THEN I thought of Geo.
The Federal 30% deduction for geo includes cost to
restore the ground after burying the ground loop.
So, the driveway will definitely be done later.
Having room for about 6 separate circuits means,
I can have different minimum loop temperatures
for each loop. The driveway is not allowed to go
below 32, for example. I can turn off that pump
when that loop is cold.
|