View Single Post
Old 07-17-18, 10:27 PM   #3
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I have the tool box put together. I bought some magnetic tool holders to rivet to the top lid.

My 24" breaker bar fits right down through the top on the right side very nice.




I have three other craftsman ball bearing boxes this box is on par with those. This one will not replace my other boxes it is just much more mobile.
I will take it to the job at hand.

I will add some assembly hints.
Castors make them tight when you install them. Do not tighten any other bolts up completely until completely built then tighten from the top down.
This will work out well if you do it this way.
Attached Images
  
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by pinballlooking; 07-18-18 at 10:12 AM..
pinballlooking is offline   Reply With Quote