View Single Post
Old 09-11-16, 07:49 PM   #8
stevehull
Steve Hull
 
Join Date: Dec 2012
Location: hilly, tree covered Arcadia, OK USA
Posts: 826
Thanks: 241
Thanked 165 Times in 123 Posts
Default

I have successfully used sub-slab supply ducting (glued PVC) and as a side benefit it really heated up the concrete slab floors in the winter (dogs loved it!).

The old metal ducts clearly don't work (they always rust out), but the glued 8 inch long tube type PVC ducts are absolutely watertight.

Not hard to do and now the supply ducts are completely out of the way - and there are NO air leaks. You can do a common air return and/or return "jump" ducts into bedrooms and other closed off spaces.

Your RFD and/or insurance carrier can tell you the amount of water that qualifies for the discount. In my case it had to be a 1/4 acre pond at least an average of four feet deep (total of one acre foot) and had to be there all year round.

Be realistic and do what you can do. Hire out tedious stuff as otherwise you will have a two year build phase or never quite have anything done. Remember that construction loans are only for 365 days.

All is simple, but there is an advantage to getting pros to come in to quickly get you dried in. With SIPS, this is no more than two weeks.

Also, hire out the brickwork - they are just so damn fast and perfect.

Have fun!

Steve
__________________
consulting on geothermal heating/cooling & rational energy use since 1990
stevehull is offline   Reply With Quote