View Single Post
Old 03-21-15, 08:45 AM   #21
gtojohn
Journeyman EcoRenovator
 
gtojohn's Avatar
 
Join Date: Jul 2014
Location: Austin, TX
Posts: 314
Thanks: 39
Thanked 50 Times in 45 Posts
Default

My property is not level there's about 2' of difference between front and back. 4" slab in front means 2' 4" in back. Cost is also higher because of my remote location. 4k was the low bid 9k was the crazy bid. 4 other foundation companies had better things to do than give a quote.

gtojohn is offline   Reply With Quote