Thread: Solar Swing-Set
View Single Post
Old 08-17-13, 09:06 PM   #6
where2
DIY Geek
 
Join Date: Apr 2013
Location: Sunny Florida
Posts: 401
Thanks: 74
Thanked 83 Times in 73 Posts
Default

Quote:
Originally Posted by Daox View Post
Sounds pretty good to me. I am wondering why you want/need to run a ground from the aluminum frame?
Probably that nagging requirement of an Equipment Grounding Conductor mentioned in NEC 2011 690.43.

Mike Holt has a good video on YouTube on the subject. Search for "NEC 2011 Solar - Equipment Grounding 690.43"
where2 is offline   Reply With Quote