View Single Post
Old 10-06-17, 05:38 PM   #5
Sccoupe
Helper EcoRenovator
 
Join Date: May 2017
Location: PA
Posts: 43
Thanks: 4
Thanked 16 Times in 8 Posts
Default

I guess it just took a little motivation. Didnt take as long as I thought it would. Trenches are done. Need to clean up, leak test the pipes, drop them in the holes, fill with limestone dust, notch the plastic casing as low as possible, pull the pipes though and route into the house. Thats still a mess of work to do before it rains on Sunday. Gotta get all of the 'in the trench' work done before it rains or its going to be a total mess to work with.

Sccoupe is offline   Reply With Quote
The Following User Says Thank You to Sccoupe For This Useful Post:
Fordguy64 (10-06-17)