View Single Post
Old 03-15-16, 06:40 AM   #12
Servicetech
Apprentice EcoRenovator
 
Servicetech's Avatar
 
Join Date: Nov 2013
Location: Moore Oklahoma
Posts: 267
Thanks: 108
Thanked 23 Times in 21 Posts
Default

Quote:
Originally Posted by MN Renovator View Post
Figuring that this system is probably oversized and I figure it wouldn't even run 1/3 the time of a day, that would an air exchange for a 1000 square foot building. That doesn't seem like many times over.
100k furnace would run 1/3 of the time on a design day, mush less on a normal day. Look at Therms burned in a month to get a better look at actual run time.
Servicetech is offline   Reply With Quote