<<<continued from previous post<<<
Twin plenum installed:
Kitchen boots installed:
Corridor duct:
Corridor duct installed on the left, VPR recessed motorized lift (DIY, of course!) and twin boot on the right, Santorini in the center
:
Kitchen return ductwork:
Distribution plenums and drywall construction:
Cladding finished, this is the kitchen return hood:
And this is a finished view with the new lighting fixtures:
>>>continues to next post>>>