View Single Post
Old 11-26-18, 12:35 AM   #3
Geo NR Gee
Journeyman EcoRenovator
 
Join Date: Jan 2011
Location: Seattle
Posts: 326
Thanks: 109
Thanked 23 Times in 18 Posts
Default

The racking and frames were installed today. The evacuated tubes will be installed in the next few days. We will test the drainback after all manifolds are connected. Hopefully the drainback slope will be sufficient to prevent freeze problems.

Maybe Monday I will receive information from the manufacturer if the system will work that way.
Attached Images
 
Geo NR Gee is offline   Reply With Quote