Quote:
Originally Posted by Ron342
Are your holes filled with water??? If not would they hold water you added??
Might eliminate the need for grout.
|
If i added water and filled mine would take the water down to around 13 or so ft then stand being that is where the static level of water is . Here i hit a bearing layer of water bearing beach sand at 12-17 ft then all blueish clay until 300ft deep.