Quote:
Originally Posted by opiesche View Post
Couldn't you just run five or six parallel loops in the floor, run them all to the garage or basement or wherever your manifold is, and join them all there before connecting them to the manifold? That would give you similar flow characteristics, and all your couplings would be easily accessible and fixable.
Yeah, that would work too. Its a bit more tubing to run, but safer from leak problems.

This might present a problem if you're using a zone control valve though. You'd have to tie them together before the valve somehow. Not a big deal really.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote