View Single Post
Old 07-29-13, 09:17 PM   #1534
randen
Uber EcoRenovator
 
Join Date: Apr 2011
Location: Strathroy Ontario Canada
Posts: 657
Thanks: 9
Thanked 191 Times in 129 Posts
Default

I checked in with some local installers. The common response was 600 ft of 3/4 HDPE per ton. The suggestion of slinky was frowned upon as a lot of the tube passes closer than 16" from tube to tube as it coils.

The heat-pump system is worth a lot of time and money to install it properly. To not revel in the superior efficiency is a complete waste.

Randen
randen is offline   Reply With Quote