I dug under the foundation and up into the crawl space started a 6 am. All hand digging in very hard clay. That was a pain in the butt it is done. I then mounted the manifold in the crawl space.

I have the first to loops done and the return lines staked 2’ up the trench. it was a muddy mess. They finished digging the trench so I can now install the next two loops then start back filling.



Water is about a foot deep in places.
I was dark when I finished so I did not get any pictures. I was a wet cold muddy mess. Red wet clay everywhere.
Attached Images
 
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
pinballlooking is offline   Reply With Quote
The Following User Says Thank You to pinballlooking For This Useful Post:
Daox (12-18-18)