So, I got my first quote back on 2 yards of concrete for $276. Sounds a lot better than mixing it all myself. I'm still not sure I really need that much though. The quikrete site says if you have a 4" pole, you need a 12" hole. I'm not sure what it means when you have a 2x6. I also don't think I'll be sinking the 2x6 into the concrete. Talking with some of the guys here at work they think it would be better if I sunk some steel into the concrete and bolted to that. That would make the wood last longer since it won't be exposed to as much moisture. This sounds good to me since it will be easier to make the holes, pour the concrete, and line things up afterwards instead of making some framing to hold everything in place while I pour. Any recommendations? I'm completely new to this.
__________________
Current project - To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. & To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Last edited by Daox; 06-15-11 at 09:34 AM..
|