View Single Post
Old 08-20-12, 09:38 AM   #132
Xringer
Lex Parsimoniae
 
Xringer's Avatar
 
Join Date: Feb 2009
Location: Woburn, MA
Posts: 4,918
Thanks: 114
Thanked 250 Times in 230 Posts
Default Status Report 8/2/12 ~ 2/20/12

Status Report 8/2/12 ~ *8/20/12

Today, it's been about 18 days since we started our measurements.
On the 16th, we turned up the setpoint to 130F. Trying for more dehum.
During the last few days, the ave outdoor temp is down and the basement is @70F.

During the 18 day run, the A7 has run for 26.5 hours ($4.33)
About 25 cents a day is way better than $2 a day for oil heated water!

Yesterday, I started the final pipe insulation work, using the self-sealing foam jacket stuff.

I will finish up the connection segments with adhesive wrap insulation,
or just pipe foam with duct tape to secure it.
Attached Images
 
__________________
My hobby is installing & trying to repair mini-splits
EPA 608 Type 1 Technician Certification ~ 5 lbs or less..
Xringer is offline   Reply With Quote