View Single Post
Old 06-15-11, 12:04 PM   #14
Xringer
Lex Parsimoniae
 
Xringer's Avatar
 
Join Date: Feb 2009
Location: Woburn, MA
Posts: 4,918
Thanks: 114
Thanked 250 Times in 230 Posts
Default

One of these things?




Or, if you had some very large angle iron. Put some bolts or steel rods
under the surface to hold-down, and 3" lag bolts up top..

Or, a pair of angle irons cross bolted together (with a 4" spacing)
under the concrete, so the 4x4s would fit between them, up top.
Use 3" lag bolts or drill the 4x4s and use 3/8" or 1/2" carriage bolts with washers & nuts.
Xringer is offline   Reply With Quote