After doing a ton of googling I just want to make sure I have the basic procedure right...
1. Install service port like this on high and low side:
(Can't post ebay link, don't have enough posts here yet)
2. Hookup cheapest refrigeration gauge set I can find.
3. Pull vacuum on system.
4. Slowly fill with propane until the pressure is in the right range.
Does that sound about right? Are the high and low side pressures going to be about the same for propane? (Says 170/380 on the machine)
|