View Single Post
Old 11-20-18, 10:03 AM   #10
pinballlooking
Super Moderator
 
pinballlooking's Avatar
 
Join Date: Jun 2013
Location: SC
Posts: 2,923
Thanks: 172
Thanked 564 Times in 463 Posts
Default

I am going to look for some software or tool to do a manual J. I am with randen here. My mini splits can keep up on very hot days. 3.75 ton
We are not going to get rid on the mini splits. So maybe scale down to a 3 ton two stage system. Dig the loops with my 10” bucket.

That would take my loops to 3 600’ about 1800’ of trench. I am not sure how long that would take to dig.
Time is on my side since I have the mini splits.
__________________
Current project Aquaponics system , Passive Solar Greenhouse build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Solar Install 12.5 Kwh-
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Mini Split installs -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

EV Chevy Volt -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
pinballlooking is offline   Reply With Quote