The racking and frames were installed today. The evacuated tubes will be installed in the next few days. We will test the drainback after all manifolds are connected. Hopefully the drainback slope will be sufficient to prevent freeze problems.
Maybe Monday I will receive information from the manufacturer if the system will work that way.