I need to "play catch-up" a bit as far as media editing and blogging.
At this point, the blow-in insulation is all installed, we got the plywood paneling in downstairs, some painting done, and the garage doors installed.
Last night and this morning, I worked on the hydronic heat.
I've been out of town a bunch lately, was rather ill for about 2 weeks, have a midterm to study for, I still have to do taxes!
Once I take care of a few things, I'll get caught up with photos and videos, but I'm very excited with how things are going.
Probably the next big thing is ordering equipment for the Solar PV install.
Hey Daox, want to go pick up solar panels with me sometime?
__________________
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
|