Pinnball, you wrote that "The M250 can have 16 modules on a branch circuit and that goes to a 20 amp breaker."
However, reading the Enphase material they state that only 14 M250 modules should be on a 20A string (17 for M215s).
Comments?
Steve
__________________
consulting on geothermal heating/cooling & rational energy use since 1990
|