Ko_deZ
The explanation for the humidity of the (ground loop only)air conditioning is true to result. This arrangement was only the prelude to a GSHP system I intend to assemble and to provide some relief from the summer heat in the shop. The shop itself is insulated well and fairly air tight. The shop originally had a 2T air to air conditioner that on very hot humid days would not keep up expecially with the machines running. I would expect the 3.5T GSHP would do very nicly.
Looking very forward to the hack The compressor is removed and the electrics are in a box. I have the circulation pumps, one is on the loop and the other is waiting in another box. Currently I'm machining a 4 way valve. This will exchange the flow of water/glycol from one HX to the other HX. Cooling/Heating. The copper tube is just placed in for a visual upon assembly it will be silver soldered into place.
Randen
|