Default More pex loops better???

I'm putting hydronic pex heating in a high mass concrete slab 14' x 30'. It is for an open room floor plan so it could easily be done with just two loops and meet 1/2 pex length recommendations(approx two 200' loops) spaced from 6" apart near exterior to 12" in the interior. But would increasing number of and shortening the length be better for supplying more and quicker heating if needed(worst case demand). It certainly wouldn't over complicate the system to have 3 or 4 loops in the manifold to any great cost. Structure is super insulated to R50 walls and R80 ceilings. and all the details of Hi-R construction built into the design. Once the slab is poured its too late for any should have's, lol.

Drake is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
Old 07-09-18, 10:43 PM   #2
Supreme EcoRenovator
 
AC_Hacker's Avatar
 
Join Date: Mar 2009
Location: Portland, OR
Posts: 3,987
Thanks: 298
Thanked 696 Times in 521 Posts
Default

Quote:
Originally Posted by Drake View Post
I'm putting hydronic pex heating in a high mass concrete slab 14' x 30'. It is for an open room floor plan so it could easily be done with just two loops and meet 1/2 pex length recommendations(approx two 200' loops) spaced from 6" apart near exterior to 12" in the interior. But would increasing number of and shortening the length be better for supplying more and quicker heating if needed(worst case demand). It certainly wouldn't over complicate the system to have 3 or 4 loops in the manifold to any great cost. Structure is super insulated to R50 walls and R80 ceilings. and all the details of Hi-R construction built into the design. Once the slab is poured its too late for any should have's, lol.
The closer the PEX runs, the more efficient it will be.

Old School Amreican rule of thumb is 12" spacing; from my research, Northern Europeans favor closer spacings, with 6" not being unusual. European energy is much more expensive than ours is now.

Sounds like you have a handle on PEX run lengths, and headers, etc.

I'd advise closer PEX runs, similar to the Northern European practice.

You are right about quicker temperature increase, but temperature decrease will be no different.

The real benefit to you will be lower fuel cost over the life of your system.

Hope this helps.

Regards,

-AC_Hacker

__________________
I'm not an HVAC technician. In fact, I'm barely even a hacker...
AC_Hacker is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 08:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2018, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO
Ad Management by RedTyger
Inactive Reminders By Icora Web Design