toyobug's home projects.
I started this thread to show the improvements I've made over the past year. Once I figure out how to get the pics loaded I'll post them.
|
4 Attachment(s)
this is my hall bathroom before the "incident", which was a busted pipe in the "wet wall". Thank GOD for insurance!:)
http://ecorenovator.org/forum/attach...1&d=1222359485 this is it during demo (sorry it's not a better pic, I didn't know about this site at the time, I was actually trying to show the water between the tile and subfloor.) http://ecorenovator.org/forum/attach...1&d=1222359963 This is it 90% complete. Much better don't ya think! http://ecorenovator.org/forum/attach...1&d=1222360202 http://ecorenovator.org/forum/attach...1&d=1222360599 I have TONS more pics, but man it's such a process to upload them (hint hint Daox) I Have pics of all my projects. Some good ones and some decent ones. I'll do my best to get a bunch loaded. Maybe they'll be some inspiration for someone to try something they never have before. This house is only the second one I've done major remodels on. All comments welcome. I'm here to learn. More to come........ |
|
the new drop in stove and microwave above are Energy stars! As well as the dishwasher and fridge.
|
replaced kitchen light fixture with the flourescent.
replaced linolium flooring with wood floors, that ended up getting replaced after the bathroom water "incident" with ceramic tile. Pics on that to follow. |
here's the backroom before during and after.
http://ecorenovator.org/forum/attach...1&d=1222363821 http://ecorenovator.org/forum/attach...1&d=1222364061 this is the best one I have during construction...I put a double layer of the pink panther stuff behind the paneling. I forget the R rating on the stuff. I got the highest rating they had. Future plans are energy efficient windows. Now that there's only 4! There were 17 before!!!!!! http://ecorenovator.org/forum/attach...1&d=1222364458 finished..WHEW! this first one is taken while standing in the door way leading into the dining room. You can barely make out the closet in the background that I had to build for my oldest daughter who has TOO many clothes! http://ecorenovator.org/forum/attach...1&d=1222364761 this one is taken standing where the window A/C is, which was also replaced with an Energy Star model.(sorry no pic for it) Yes my oldest daughter is spoiled and has the biggest room in the house now. http://ecorenovator.org/forum/attach...1&d=1222365237 pics for other projects to come later... Ideas welcome. |
1 Attachment(s)
here's the master bath before, during demo, during construction, and finished.
I took out the built in shower to make it a full bath with a tub. Both master and hallbath tubs were raised 6"s. My wife's idea..don't ask. afterwards I thought it looked pretty good, and it didn't take much to do. This is the only before pic I have of the masterbath. The after pics are a little better. http://ecorenovator.org/forum/attach...1&d=1222366045 during demo:eek: The bathrooms are back to back. The wall in the master bedroom was moved out a foot to allow for bigger vanity's. the pics don't do it justice, but believe me it's a huge difference. and We don't miss the foot in the master bedroom. Again..thank GOD for insurance! http://ecorenovator.org/forum/attach...1&d=1222366507 puttin it all back together...slowly.. http://ecorenovator.org/forum/attach...1&d=1222366810 and the finished product..man am I glad it's done! http://ecorenovator.org/forum/attach...1&d=1222367637 that's it for today. I'll post pics from my other projects later. |
Wow, it looks like you've really done a lot of work on the house, and all in the past year!?! Amazing. Looks really good too.
What is next on the list? |
Thanks.
the backroom was done over christmas vacation last year. It only took me 2 1/2 days. The bathrooms were done this summer, they took about 5 weeks. That included laying ceramic tile in the laundry room, dining room, hallway, and f course bothe bathrooms. An I repainted the dining room. Things can get done failry quickly when you have all day everyday to work on them. Next on my list is the solatubes I think. I'm still trying to find the ones I found a few months back for $250-$350. Last summer I did some work on my back yard, I just haven't gotten the pics loaded yet. |
3 Attachment(s)
here are some pictures from my back yard project. Pool installation (done by company). The deck was built by my son and I.
the pool going up... http://ecorenovator.org/forum/attach...1&d=1222439528 the deck being built... http://ecorenovator.org/forum/attach...1&d=1222439826 finished product...(you can see all the windows I covered up during the backroom project.) http://ecorenovator.org/forum/attach...1&d=1222440029 |
All times are GMT -5. The time now is 05:29 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Ad Management by RedTyger