View Single Post
Old 10-25-10, 06:13 AM   #48
Daox
Administrator
 
Daox's Avatar
 
Join Date: Aug 2008
Location: Germantown, WI
Posts: 5,525
Thanks: 1,162
Thanked 374 Times in 305 Posts
Default

For sealing against the chimney, I thinking I'm going to add a 2x4 base/frame to the top of the chimney. The platform (or box if I go that route) will screw onto the 2x4 frame. This will make it easier to remove if need be.

In the mean time. I'll be looking into controller options. I think I have some temperature sensors from when I was doing the arduino thermal differential controller, so I'll probably look into that route first.
__________________
Current project -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
&
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Daox is offline   Reply With Quote