View Single Post
Old 12-28-13, 01:52 PM   #8
jeff5may
Supreme EcoRenovator
 
Join Date: Jan 2010
Location: elizabethtown, ky, USA
Posts: 2,428
Thanks: 431
Thanked 619 Times in 517 Posts
Send a message via Yahoo to jeff5may
Default

The two processes I'd love to see progress in are:

1. Stirling Cycle (refrigeration and CHP)

2. Dessicant Systems (both PCM and liquid-based heating/cooling/dehumidification)
jeff5may is offline   Reply With Quote